![Home](_derived/home_cmp_indust000_vbtn.gif)
![Services at Salen Pier](_derived/services.htm_cmp_indust000_vbtn.gif)
![Diving](_derived/diving.htm_cmp_indust000_vbtn.gif)
![Accommodation](_derived/accommodation.htm_cmp_indust000_vbtn.gif)
![Local Facilities](_derived/Local.htm_cmp_indust000_vbtn.gif)
![History](_derived/History.htm_cmp_indust000_vbtn.gif)
![Restoration](_derived/restoration.htm_cmp_indust000_vbtn_p.gif)
![Photo Gallery](_derived/Photo.htm_cmp_indust000_vbtn.gif)
![Contact Us](_derived/ContactUs.htm_cmp_indust000_vbtn.gif)
|
|
Extensive repairs have been carried out including:
Ø
Installed 10 new pier legs, with large M24 x 650mm galvanised bolts
specially manufactured,
Ø
Replaced all roadway timbers, this required over 3,500 x 180mm M12
galvanised coach screws to be installed!!,
Ø
Replaced all handrail posts (50) and rails, made to original design.
Each post is held on with M24 galv bolts, plus new galvanised saddles,
Ø
Restoration
of one of the original waiting rooms,
Ø
Installation of two ladders, plus a set of steps.
![](images/Restoration/2007%20pier%20legs.JPG)
As purchased in 2007, many legs missing |
![](images/Restoration/2014%2005%2002%20pier%20legs.jpg)
Spring 2014, new legs and cross braces in place.
|
![](images/Photos/2012%2004%20with%20wellboat.JPG)
2012, new legs and ladder in place. |
![](images/Restoration/2014%2005%2002%20view%20of%20pier.jpg)
View to shore in 2014 with restored building. |
|
|
.
|